Major maintenance and technical upgrade of residual crude tank 05T-102 at the Petro Roraima S.A. facilities, restoring its structural integrity, level measurement accuracy and corrosion protection under API, NACE and NFPA standards.

Tanzaca technician working on scaffolding on the wall of an oil tank
  • ActiveProject status
  • 4Disciplines working as one project
  • API · NACE · NFPAReference standards
  • Petro RoraimaClient

The project

Tank 05T-102 is a residual crude tank at the Petro Roraima S.A. facilities. The project is a major maintenance and technical upgrade of the tank, aimed at restoring its operational reliability under the highest international standards.

It is carried out as a single multidisciplinary effort, so that every discipline works toward the full operational recovery of the tank.

What the project sets out to achieve

Structural integrity

Guarantee the structural integrity of the tank.

Level measurement accuracy

Ensure precision in the tank's level measurement systems.

Corrosion protection

Ensure the efficiency of the tank's protection against corrosion.

Scope of work

The work is organized in four disciplines that run together as one project:

  1. Civil works

  2. Mechanical works and metalworking

  3. Electrical works and cathodic protection

  4. Instrumentation works

Standards

The project is carried out under three reference standards bodies.

API
American Petroleum Institute. Standards for oil-industry equipment, including storage tanks.
NACE
Corrosion control standards (NACE International, today part of AMPP).
NFPA
National Fire Protection Association. Fire and safety codes, including those for flammable liquids.

Request a quote

Planning a similar project?