Completed project

Project 04 / 04

Pigap II · El Tejero

Spool fabrication and installation

Design, fabrication and assembly of specialized spools for the thermoelectric sector at the Pigap II plant in El Tejero, integrating critical components for high-temperature fluid management, such as control valves and monitoring systems.

Piping spools and a control valve fabricated and installed by Tanzaca at the Pigap II plant
  • CompletedProject status
  • El TejeroLocation
  • ThermoelectricSector

The project

Tanzaca designed, fabricated and assembled specialized spools for the Pigap II thermoelectric plant in El Tejero.

The project integrated critical components for the management of high-temperature fluids.

What was delivered

Specialized spools

Design, fabrication and assembly of spools for the thermoelectric sector.

Valves and monitoring

Installation of control valves and monitoring systems.

Safety standards

Fabrication under strict thermoelectric safety standards.

Pre-fabrication

Assembly times optimized through pre-fabrication.